May 1,2007

CLS Construction Project

 

-A Building for Theological Education and

Church Resources Center

The Model of Theological Education and Church Resource Center

A General Description

1. A 7-story multi-purpose building with a bi-level

basement will be constructed:

a. Total budget is NT$200 million (US$6.7 million).

b. Projected date for groundbreaking is July 2005.

c. Projected date of completion is September 2007.

d. Total floor area : 9240

e. Three Section of Muiti-purpose Building

1st Section: China Lutheran Seminary Campus

-A theological digital library with capacity

 of 60 to 100 thousands books

- Research Center for Traditional

Chinese  Religions and New Religious

Movements,  which meets the needs of

this era.

-Professors with solid theological

 background and Study Rooms for

 students

- Lay-people training courses and Lodge

 forretreat

- Graduate School in Luther Studies

with  solid theological foundation

- Plain but comfortable dormitory for

  single and married students

- Mission Center - Halls for social

 intercourse and Dinning Hall

        2nd Section: Campus Church

- Medium Church with 480 members

3rd Section: Joint Offices for Church

     Organizations - Contains 7 Para-church

     organizations'  offices.

f. Building Introduction:

4F-7F the Fellowship Training Center,

the Faith Training Center, Student

Dormitories and the Social Center

3F Classroom, Teachers, Study Room,

the LutherTheological Research Center,

the Religion Center

1F-2F the Digital Theological Library, the

Community Center for Cooperative

Churches,

Offices Outdoor Athletic Field

B1F Multi-Function Assembly Hall (with

480 seats for audience), Conference

Rooms, a Dining Hall and a Kitchen

B2F Indoor Parking Space, Storerooms

 



Posted by CLSwebblog at 樂多Roodo! │08:25 │引用(0)Building Project
樂多分類:日記/一般 工具:編輯本文
Ads by Roodo! 

引用URL

http://cgi.blog.roodo.com/trackback/2603445