May 14,2007
Friends from Southern Taiwan--Lutheran Church of Taiwan
The external hardware of Theological Education and Church Resources Center has been completely. These two days, on 14th and 15th May, there are over 30 pastors and evangelists of Lutheran Church of Taiwan participating in the training and brainstorming of this meeting. It is a good opportunity for them to know the current condition of the construction project and for us (CLS) to know and understand them more. May them benefit a lot from the training not only brain but also spiritual life. May 2,2007
CLS Newsletter
May 1,2007
CLS Construction Project
-A Building for Theological Education and
Church Resources Center

A General Description
1. A 7-story multi-purpose building with a bi-level
basement will be constructed:
a. Total budget is NT$200 million (US$6.7 million).
b. Projected date for groundbreaking is July 2005.
c. Projected date of completion is September 2007.
d. Total floor area : 9240 ㎡
e. Three Section of Muiti-purpose Building
1st Section: China Lutheran Seminary Campus
-A theological digital library with capacity
of 60 to 100 thousands books
- Research Center for Traditional
Chinese Religions and New Religious
Movements, which meets the needs of
this era.
-Professors with solid theological
background and Study Rooms for
students
- Lay-people training courses and Lodge
forretreat
- Graduate School in Luther Studies
with solid theological foundation
- Plain but comfortable dormitory for
single and married students
- Mission Center - Halls for social
intercourse and Dinning Hall
2nd Section: Campus Church
- Medium Church with 480 members
3rd Section: Joint Offices for Church
Organizations - Contains 7 Para-church
organizations' offices.
f. Building Introduction:
4F-7F the Fellowship Training Center,
the Faith Training Center, Student
Dormitories and the Social Center
3F Classroom, Teachers, Study Room,
the LutherTheological Research Center,
the Religion Center
1F-2F the Digital Theological Library, the
Community Center for Cooperative
Churches,
Offices Outdoor Athletic Field
B1F Multi-Function Assembly Hall (with
480 seats for audience), Conference
Rooms, a Dining Hall and a Kitchen
B2F Indoor Parking Space, Storerooms